REFERENCES

Koksoprojekt is the author of the documentation for the construction or modernization of most of the country's coking plants, including over 50 coking batteries with coke oven gas purification installations with the recovery and processing of by-products.



  • COKE OVEN BATTERIES (WITH ACCOMPANYING FACILITIES)


     

    • Przyjaźń Coking Plant in Dąbrowa Górnicza –Battery no. 5 in top charge system with infrastructure and accompanying machines – design and participation (consortium) in turnkey construction.
    • Przyjaźń Coking Plant in Dąbrowa Górnicza –Battery no. 1 in top charge system with infrastructure and accompanying machines – design.
    • Przyjaźń Coking Plant in Dąbrowa Górnicza –Battery no. 4 in stamping charge system with infrastructure and accompanying machines – design.
    • WZK "Victoria" coking plant in Wałbrzych – Battery no. 6 with infrastructure and accompanying machines – desing and General Investment Contractor,  consortium leader.
    • Radlin Coking Plant – Battery no. 1bis with accompanying facilities – Construction Design for building permit, executive design.
    • Radlin Coking Plant – Battery no. 1bis stamp coal charging machine – design and participation (consortium) in turnkey construction.

  • COKE OVEN GAS PURIFICATION, by-products PRODUCTION AND PROCESSING INSTALLATIONS

     

    • Przyjaźń Coking Plant in Dąbrowa Górnicza - comprehensive modernization of the By-Product Plant; including coke oven gas purification using desulfurization by the ammonia method with integrated deacidification-stripping columns, as well as Catalytic ammonia cracking and sulfur production by Claus proces - design and participation in turnkey construction.
    • WZK "Victoria" coking plant in Wałbrzych - comprehensive modernization of the By-Product Plant; including coke oven gas purification using desulfurization by the ammonia method with integrated deacidification-stripping columns, as well as Catalytic ammonia cracking and sulfur production by Claus proces - Turnkey Contractor.
    • Przyjaźń Coking Plant in Dąbrowa Górnicza - Coke oven gas debenzolization installation with benzole desorption unit and wash oil regeneration unit using a high-efficiency Integrated Wash Oil Still – IWOStill (Koksoprojekt patent)
      – Designer and Turnkey Contractor
    • U.S. Steel Košice Coking Plant (Slovakia) - Coke oven gas purification installation using desulfurization by the ammonia method with integrated deacidification-stripping columns, as well as Catalytic ammonia cracking and sulfur production by Claus proces- design and participation in turnkey construction.
    • ArcelorMittal Poland S.A. Branch in Krakow - Installation for desorption of acidic components and ammonia from process water using integrated deacidification-stripping columns, as well as Catalytic ammonia cracking and sulfur production by Claus proces - design, supervision and participation in the commissioning of the installation.
    • JSW KOKS S.A. - Radlin Coking Plant - Modernization of the Secondary coke oven gas cooling unit - design and participation in turnkey construction.
    • ArcelorMittal Poland S.A. Branch in Zdzieszowice - Comprehensive design documentation for Installation for desorption of acidic components and ammonia from process water using integrated deacidification-stripping columns, as well as Catalytic ammonia cracking and sulfur production by Claus proces – design and supervision.
    • ArcelorMittal Atlantique et Lorrainf (France) - Instalation of benzole absorption from coke oven gas and installation of wash oil regenerator - Koksoprojekt patent - Designer and Turnkey Contractor
    • JSW KOKS S.A. - Radlin Coking Plant - Modernization of the coke oven gas purification line with a coke oven gas debenzolization installation with a benzole desorption unit and wash oil regeneration unit using a high-efficiency  Integrated Wash Oil Still – IWOStill (Koksoprojekt Patent) along with accompanying installations (including primary gas cooling) - Designer and Turnkey Contractor.
    • JSW KOKS S.A. - Radlin Coking Plant - Installation for desorption of acidic components and ammonia from process water using integrated deacidification-stripping columns, as well as Catalytic ammonia cracking and sulfur production by Claus proces - design and participation in turnkey construction.
    • Třinecké železárny Coking Plant (The czech republic) - Wash oil regeneration installation - Designer and Turnkey Contractor.
    • JSW KOKS S.A. - Radlin Coking Plant – Instalation of H₂S and NH₃ absorption from coke oven gas using an integrated H₂S and NH₃ scrubber and installation of secondary cooling - Turnkey Contractor - design and construction in progress.
    • WZK "Victoria" coking plant in Wałbrzych - Modernization of the secondary coke oven gas cooling unit – Design.

  • TECHNOLOGIES FOR MAIN AND CURRENT RENOVATIONS AND MODERNIZATIONS CARRIED OUT IN CONTINUOUS OPERATION CONDITIONS

     

    • ArcelorMittal Poland S.A. Branch in Zdzieszowice – side platforms of batteries no. 7 and 8, stamp coal charging machines, coke sorting plant no. 3.
    • Jadwiga Coking Plant in Zabrze - coke chute, quenching tower, coke sorting plant.